Selecting the start run option will move the controller on to a page that looks similar to this:

sfdc_confirm_start_run

Press the 0 key to confirm the start run action. The controller will return to the front page ready for the next worker ID scan. Press the Back key to return to previous pages to review or edit them.

Using this option tells the system that the worker who scanned this operation has started to run the operation. The time the run started, who started it and what resource(s) they are using is logged against the works order. You can see these logs by looking at the progress on the works order (see later).