Identify Resource and Time Required

workbook_identify_resource_and_time_required

 

What is it?

The method editor.

When do I do it?

When you want to identify or update a method.

How do I get there?

Press the Method button from the Materials Catalog.

What must I do?

Press the +Resource button and drag the required resources into the method.

Double click on them in the method to edit the details. For example, to set the time required.

Notes